2 sources · updated 2h ago
UK’s Ofgem goes big on LDES cap-and-floor window 1; 18-hour lithium-ion among winners
Coverage — read at the source
- energy-storage.news · 2h ago
UK’s Ofgem goes big on LDES cap-and-floor window 1; 18-hour lithium-ion among winners ↗
UK energy regulator Ofgem has shortlisted 16 projects for the first ever long-duration energy storage (LDES) cap-and-floor scheme, totalling 7.6GW of capacity ranging from 8- to 22-hour durations.
- ess-news.com · 3h ago
Pumped hydro and lithium BESS top UK LDES cap and floor ↗
Ofgem has revealed provisional list of 16 projects that can progress through new support scheme for long-duration energy storage (LDES). Four technologies selected, with pumped storage hydro and lithium-ion batteries the biggest winners. The post Pumped hydro and lithium BESS top UK LDES cap and floor appeared first on Energy Storage .